BLACKWATER CREEK MITIGATION BANK

Blackwater Creek Mitigation Bank

Blackwater Conservation Bank
Wekiva River Nested
St. Johns River (Wekiva to Welaka)
Lake
Forested; S & F
Herbaceous; S & F

The Blackwater Creek Mitigation Bank (BCMB) is 466 acres located in the Wekiva River Nested Drainage Basin. BCMB is approved by the St. Johns River Water Management District and the United States Army Corps of Engineers to provide both freshwater forested and herbaceous wetland credits. 

The BCMB was a former sand mine operation. The property was mined below the water table in most areas. As a consequence of mining, the hydrology of the site was altered and overburden was deposited on the adjacent wetlands and uplands. Extensive restoration includes earthwork to restore the historic hydrologic conditions as well as extensive planting of native wetland vegetation.

The St. Johns River Water Management District has determined the Wekiva Basin to be of critical concern and designated it as a Nested Basin. The BCMB is located adjacent to environmentally sensitive tracts of land that are contiguous with the Ocala National Forest.

Determine if your project is located in the bank's service area. DOWNLOAD MAP PDF
Make Inquiry
Share by: